Procurement Document for AV Equipment for

‘Shinty’s Story – Sgeul na Camanachd’

Overview

The Camanachd Association (CA) aims to integrate advanced AV equipment into the “Shinty’s Story – Sgeul na Camanachd” exhibition to provide an interactive and immersive visitor experience. The equipment will include screens, projectors, sound systems, and interactive displays. The timeline for delivery and installation is three months from the contract award.

Methodology

Suppliers should outline their methodology for sourcing, delivering, and installing the AV equipment. This should include specifications for each piece of equipment, installation procedures, and integration with the exhibition’s digital content. Emphasis on user-friendly interfaces, accessibility and long-term reliability is essential. Organisations that can demonstrate a track record of environmental responsibility will be looked upon favourably.

Outputs/Deliverables

Deliverables include the procurement, delivery, and installation of AV equipment, along with detailed user manuals and training for staff. All equipment must be tested and fully operational upon installation. Regular progress reports and a final demonstration to our project team are required.

Timetable

Please see the below timetable of exhibition fit out. For all relevant drawings please contact Aarron.macleod@shinty.com.

Timetable for Contractors

Contract Management

The project start date is anticipated within two weeks of contract award, with completion in three months. The budget is £42000  inclusive of VAT and expenses. Payment schedule: 20% upon all agreed AV spec and setting out, 60% upon AV order and content testing and 20% upon successful installation and testing. The project manager will oversee the contract.

Award Criteria

Proposals should include:

  • A detailed methodology and timeline
  • Cost breakdown including VAT and expenses
  • Relevant experience and qualifications Proposals will be evaluated on understanding of the project (20%), proposed methodology (20%), experience (20%), and cost (40%).

Procurement Timetable

  • Proposal return deadline: June 10th 2025
  • Notification of decision: June 17th 2025
  • Proposals to be sent to: macleod@shinty.com

This project is dependent on second stage National Lottery Heritage Funding which is anticipated to be confirmed on 17th June.